The connection procedure

The connection procedure is carried out in three stages:

- filling in applications for connection; (Link on the form " Application .. ")

- passing the technical inspection for compliance with the technical requirements of the DP "UA-IX"; (Link to rules)

- voting procedures for the passage of a new participant to the DP "UA-IX"; (Link to the document " voting procedure " )

- signing an agreement with DC " Ukrainian internet exchange"

After successfully passing technical inspection the applicant has the right to test a free connection to the Internet for up to 14 calendar days.